An ambitious Kenyan has built a flat roof house for just Ksh 2.6 million. The 4 bedroom house took 3 months to complete.
Below is how he spent the Ksh 2.6 million to build the house:
FOUNDATION
Estimated cost =ksh743,630
Actual Cost =ksh790,290
WALLING
Estimated cost =ksh 280,178
Actual cost =ksh 269,209
DECKING
Estimated cost= =ksh 636,400
Actual cost =ksh 685,745
FIRST FLOOR WALLING 2
Estimated cost = ksh 310, 178
Actual cost = ksh 296, 400
SLAB
Estimated cost cost = 636,400
Actual cost = 558545
STAIR ROOF AND Parapet wall
Estimated cost = 180,000
WINDOWS AND DOORS
Estimated cost = 226,000
Total Estimated cost = 2,982,786
Total Actual cost so far = 2,627,189
Deviation =355,597
From the calculations above, you can see he was prepared to spend Ksh 2.9 million but he saved Ksh255,597.
Here are the photos of the house: